Three layers of old three-tab came off this Cincinnati two-story, and both old dormers came off with them. New GAF Timberline system on the slopes, chimneys re-flashed with new crickets, the built-in box gutters relined, and the flat sections sealed under a fresh aluminum coating. The whole job, documented start to finish.
Drone view of the crew stripping two layers of shingles down to plank decking on a two-story hip roofTop-down view of exposed plank roof decking and the dormer opening beside remaining old shingles and a brick chimneyFreshly silver-coated flat roof section in front of the new architectural shingle slope and brick chimneyWide drone view of the crew stripping the hip roof to plank decking, old shingles piling at the eavesAngled overhead view of the stripped slopes, dormer opening, and the chimney rebuilt between fresh wood formsThe bare low-slope roof section from above the rake, prepped before its new aluminum coatingDrone overhead of the shingle field mid-strip with torn debris along the eaves and decking opening up at the ridgeHalf-stripped roof from above: original plank decking exposed beside the brick chimney with crew workingWhole-house top-down view with the front slope stripped to plank decking and the rear slope still shingledFresh silver coating going down over the primed low-slope membrane, seen from behind the working rooferThe whole deck dried in under synthetic underlayment with the chimney prepped and shingle bundles stagedStraight-down view of the whole deck under synthetic underlayment with shingle bundles staged across itA roofer nailing off beside the brick chimney as the new shingle courses reach itA roofer sealing the new flashing at the tall brick chimney on the freshly shingled hip roofStraight-down aerial with roughly two thirds of the new slate-blend architectural shingle laidThe steep-to-low-slope transition with fresh silver reflective coating over the flat sectionThe relined built-in box gutter running along the edge of the new shinglesTop-down on the tall brick chimney with its new step and counter flashing completeNew black step and counter flashing worked into the brick chimney beside the new shinglesStraight-down view of the completed roof, the full hip-and-valley field finished in new shingleOverhead of the finished roof: the new shingle field, the relined box gutters and the silver-coated low-slope section at the front