Skip to content
The Lifetime Pledge The NBD Guarantee The NBD Build LumaNail™ Upgrade GAF Timberline Lineup Roofivent Products GAF Pivot Boot Roof Replacement Roof Repair Storm Damage & Insurance Hail Damage Claims Siding Replacement Siding Repair Gutter Replacement Roof Inspection Roof Cleaning Fire & Water Damage Financing About Joe Reviews Our Work Service Areas Blog Instant Estimate Roof Visualizer Roof Score Storm Alerts 5-Year Storm Report Is It Worth a Claim? Free 24-Hr Inspection All Free Tools Book Inspection →
Drone view at eave height of the brick ranch before work, its old dark three-tab roof weathered and streaked Full Replacement

Forty-Five Squares, Two Days

$24,500–$25,500
Milford, OH · 2026

Forty-five squares on an 8/12 pitch, and the old three-tab was streaked across every plane. Full tear-off, then Owens Corning Duration over synthetic underlayment — with ice-and-water at the eaves and valleys, and both skylights re-flashed at no extra charge because that is where these roofs leak. Two days, start to finish.

Drone view at eave height of the brick ranch before work, its old dark three-tab roof weathered and streaked
Drone view at eave height of the brick ranch before work, its old dark three-tab roof weathered and streaked
Straight-down aerial of the whole roof before tear-off, showing the hips, valleys, octagonal bay and two skylights
Straight-down aerial of the whole roof before tear-off, showing the hips, valleys, octagonal bay and two skylights
Aerial of the roof stripped clean to bare decking with shingle bundles staged on the driveway below
Aerial of the roof stripped clean to bare decking with shingle bundles staged on the driveway below
Tight view down the ridge to the brick chimney with the decking fully exposed and old step flashing still in place
Tight view down the ridge to the brick chimney with the decking fully exposed and old step flashing still in place
Two roofers stripping shingles around the pair of skylights with the decking opened up beside them
Two roofers stripping shingles around the pair of skylights with the decking opened up beside them
Synthetic underlayment and ice-and-water membrane down over the octagonal bay with both skylights re-set and ready to flash
Synthetic underlayment and ice-and-water membrane down over the octagonal bay with both skylights re-set and ready to flash
Roofer nailing hip cap where the new architectural shingle field meets the last strip of underlayment beside the chimney
Roofer nailing hip cap where the new architectural shingle field meets the last strip of underlayment beside the chimney
Straight-down aerial with the new shingle field laid across the main roof and only the far wing still on underlayment
Straight-down aerial with the new shingle field laid across the main roof and only the far wing still on underlayment
Wide view of the rear elevation on its wooded hillside with the new roof on, walkout level and deck below
Wide view of the rear elevation on its wooded hillside with the new roof on, walkout level and deck below
← See more of our work