The NBD Pledge The NBD Guarantee The NBD Build LumaNail™ Upgrade GAF Timberline Lineup Roofivent Products GAF Pivot Boot Roof Replacement Roof Repair Commercial Roofing Storm Damage & Insurance Hail Damage Claims Siding Replacement Siding Repair Gutter Replacement Gutter Cleaning Roof Inspection Roof Cleaning Interior Repair Fire & Water Damage Financing About Joe Reviews Our Work Service Areas Blog Instant Estimate Roof Visualizer Roof Score Storm Alerts 5-Year Storm Report Is It Worth a Claim? Free Inspection All Free Tools Book Inspection →
Free homeowner guide · technical drawings

How a Roof Actually Works

A roof isn’t just shingles. It’s a stack of parts that each hand water to the next one down. These drawings show every layer, every lap and every piece of flashing, the way the manufacturers and the building code call for it.

The whole roof, pulled apart

Drag the slider to put the roof together or pull it apart, and tap any layer to see what it does. Each layer has one job, and they go on in this order.

Illustration · not a photo of an actual job
A complete roof system, pulled apart layer by layerAn exploded view of a shingle roof, bottom to top: the roof deck; metal drip edge along the eave; ice and water shield along the eave, lapping over that drip edge; synthetic underlayment over the rest of the deck; drip edge along the rake, on top of the underlayment; a starter strip at the eave; laminated shingles; a ridge vent over a slot at the peak; and ridge cap shingles over the vent.

Tap a layer

Pick any layer to see what it does. Drag the slider to put the roof back together or pull it apart.

Details per GAF Timberline installation instructions, Ohio residential code ch. 9 and Kentucky residential code (815 KAR 7:125).

The edges: eave, rake, starter

Most of the water on a roof leaves over the bottom edge, the eave. The order of the layers there is the difference between water dripping into the gutter and water running behind the fascia.

Cutaway of a roof eave: metal drip edge nailed to the deck and turned down over the fascia; ice and water shield lapped over the drip edge and running at least 24 inches past the exterior wall line; synthetic underlayment lapped over the ice barrier; starter strip and shingles hanging just past the edge. Illustration · not a photo of an actual job

The eave: drip edge first, ice barrier over it

  1. Roof deck: solid plywood or OSB; rotted boards replaced
  2. Drip edge goes on first: nailed to the deck at the eave and turned down over the fascia
  3. Ice & water shield: laps over the eave drip edge and runs at least 24 in past the inside of the exterior wall
  4. Synthetic underlayment: laps over the ice barrier, shingle-style, so water runs out
  5. Starter strip: a sealant row at the eave, set ¼–¾ in past the edge
  6. Shingles: the first course flush over the starter
  7. Exterior wall line: projected up to the deck; the 24 in is measured along the slope from here

Details per GAF Timberline installation instructions, Ohio residential code ch. 9 and Kentucky residential code (815 KAR 7:125).

Up the sloped side edges, the rakes, the drip edge and the underlayment swap places.

Cutaway of the corner where the eave meets the sloped side edge of a roof: the underlayment runs to the edge of the deck first and the metal drip edge goes on top of it, turned down over the rake board, with a starter strip up the rake and shingles finishing over it. Illustration · not a photo of an actual job

The rake: the order flips

  1. Roof deck: plywood or OSB
  2. Rake board: the trim along the sloped side edge
  3. Underlayment first: runs out to the edge of the deck
  4. Drip edge over it: at the rake, the metal goes on top of the underlayment
  5. Starter strip up the rake: set over the drip edge, sealant near the edge
  6. Shingles: finish flush over the rake starter

Details per GAF Timberline installation instructions and Kentucky residential code (815 KAR 7:125).

Close-up of the corner where the eave meets the rake: the starter strip sits a quarter to three quarters of an inch past the drip edge along both edges, with its sealant row near the edge, and the first course of shingles lines up with it. An enlarged section shows the overhang past the drip edge. Illustration · not a photo of an actual job

The starter strip: a quarter to three quarters of an inch

  1. Drip edge: at the eave and up the rake
  2. Starter strip: a little past the drip edge, eave and rake alike
  3. Factory sealant row: glues down the first course at the edge
  4. First course: flush with the starter

Details per GAF Timberline installation instructions and TAMKO Heritage application instructions.

The field: nailing and impact rating

Shingles hold on by four small nails each. Where those nails go matters more than how many there are.

A laminated shingle course with the nailing area marked and four nails in it about 6 and 7/8 inches up from the bottom edge, plus three small sections: a nail in the nailing area goes through both layers and the shingle below; a high nail misses the shingle below; a low nail lands in the exposed part. Illustration · not a photo of an actual job

Four nails, right in the nailing area

  1. The nailing area: printed on the shingle: 4 nails (6 for the enhanced pattern), about 6⅞ in up on GAF Timberline HDZ and UHDZ
  2. Exposure: the part you see: 5⅝ in per course

Too high misses the shingle below; too low leaves the nail where the next course won’t cover it. TAMKO Heritage uses its own line (6⅛ in), so it’s always the maker’s wrapper, not habit.

Details per GAF Timberline installation instructions, TAMKO Heritage application instructions and Ohio residential code ch. 9.

“Class 4” gets thrown around a lot after hail. Here’s what the rating actually measures. The GAF Timberline UHDZ I install is UL 2218 Class 4.

Illustration of the UL 2218 impact test: a 2 inch steel ball hits two shingle samples. A shingle that is not impact-rated cracks through its mat; a UL 2218 Class 4 shingle such as GAF Timberline UHDZ shows only a mark. A row of test balls shows Class 1 at 1 and a quarter inches up to Class 4 at 2 inches. Illustration · not a photo of an actual job

What “Class 4” actually means

  1. A hard hit can crack the mat: granules knocked loose; the crack is what lets water in later
  2. Class 4 shingles: built to pass two 2 in steel-ball hits in the same spot with no crack (the UL 2218 lab test). GAF Timberline UHDZ is UL 2218 Class 4.

A lab rating, not a promise: hail bigger or harder than the test can still damage any roof.

Details per Owens Corning: how UL 2218 is tested and NRCA Professional Roofing on UL 2218.

Where leaks start: walls, valleys, pipes

Shingles rarely leak in the middle of a slope. Leaks start where the roof meets something: a wall, another slope, a pipe or a chimney. That’s where the flashing does the work.

Cutaway of a roof running into a two-story wall: ice and water shield turned up the wall; an L-shaped step flashing with every course of shingles, each lapping the one below; housewrap lapped over the flashing legs; siding held up off the roof; and a kick-out flashing at the bottom turning water into the gutter. Illustration · not a photo of an actual job

Where a roof meets a wall: step flashing and kick-out

  1. Step flashing: one L-shaped piece per course: 5 in on the roof, 5 in up the wall (code minimum is 4 by 4)
  2. Each piece laps: the one below it by 2 in
  3. Kick-out flashing: required by code where a roof edge meets a wall: it turns water out into the gutter instead of down behind the siding
  4. Housewrap: laps over the flashing legs
  5. Siding: over the wrap, held up off the shingles
  6. Ice & water shield: turned up the wall at least 5 in
  7. Gutter: catches what the kick-out sends it

Details per GAF Timberline installation instructions, Ohio residential code ch. 9 and Kentucky residential code (815 KAR 7:125).

Two roof valleys side by side. Left, an open valley: a metal liner over ice and water shield, with the shingles on both sides cut back so the metal shows. Right, a closed-cut valley: shingles from one slope run across the valley and the other slope’s shingles are cut in a straight line 2 inches back from the centre, with no nails near the centre. Illustration · not a photo of an actual job

Valleys: open metal or closed-cut, never woven

  1. Metal valley liner: at least 24 in wide by code, nailed only at its edges
  2. Shingles cut back: 6 in apart at the top, widening a little toward the eave
  3. Ice & water shield: under the whole valley
  4. One side runs across: at least 12 in past the centreline
  5. Other side cut: in a straight line 2 in back from the centreline
  6. No nails: within 6 in of the centre, where the water is heaviest

Woven valleys aren’t one of the methods GAF’s or TAMKO’s instructions show for these laminated shingles, so I don’t weave them.

Details per GAF Timberline installation instructions, TAMKO Heritage application instructions and Ohio residential code ch. 9.

A roof with the shingles left off: a full-width sheet of ice and water shield centred in the valley with the underlayment lapped at least 6 inches over its edges, ice and water shield along the eaves, and ice and water shield around a chimney base turned at least 5 inches up its sides. Illustration · not a photo of an actual job

Ice & water shield: valleys and chimneys too

  1. Valley: a full-width sheet centred on the valley line
  2. Underlayment laps over it: at least 6 in on each side
  3. Eaves: at least 24 in past the inside of the wall line
  4. Up the chimney sides: at least 5 in, before the step and counter flashing
  5. Around the base: covers the deck under the flashing

Details per GAF Timberline installation instructions, TAMKO Heritage application instructions and Ohio residential code ch. 9.

A plumbing vent pipe through a shingle roof with some shingles cut away: the boot’s flat flange has its bottom edge on top of the shingles below and its top and sides under the shingles above, with its nails covered; a rubber collar hugs the pipe. Illustration · not a photo of an actual job

Pipe boots: every lap points downhill

  1. Bottom edge on top: of the shingles below, so water runs off onto them
  2. Top and sides under: the shingles above; nails up where they’re covered
  3. Rubber collar: hugs the pipe; replaced when it cracks
  4. Plumbing vent pipe: comes up through the deck
  5. Shingles fit around it: cut neatly to the collar

A generic detail. The code sends vent-pipe flashing to the shingle maker’s instructions, which win.

Air and ice: ventilation and ice dams

An attic has to breathe: fresh air in low at the soffits, warm damp air out high at the ridge. The arrows below show the path.

How attic ventilation moves air from the soffits to the ridgeA house cut in half to show the attic. Cool outside air comes in through vents in the soffits under the roof overhang, travels up through baffles that hold the insulation back from the roof deck, crosses the attic under the deck, and leaves through the ridge vent at the peak. The code minimum is 1 square foot of net free vent area for every 150 square feet of attic floor, or 1 for every 300 when 40 to 50 percent of it is high exhaust within 3 feet of the ridge and the rest is low intake.
Illustration · not a photo of an actual job

Cool air in, lowWarm air out, high

  1. Soffit vents: fresh air in, low
  2. Baffles: hold the insulation back so there’s at least a 1 in air path at the vents
  3. Insulation on the attic floor: keeps house heat out of the attic
  4. Ridge vent: warm, damp air out, high
  5. Air sweeps the deck: drying it out and keeping it cooler

Code minimum in Ohio and Kentucky (R806.2): 1 sq ft of net free vent area per 150 sq ft of attic floor, or 1 per 300 when 40–50% of it is high exhaust within 3 ft of the ridge and the rest is low intake. Example: a 1,500 sq ft attic ÷ 300 = 5 sq ft (720 sq in), 2–2.5 sq ft of it high.

Details per Ohio residential code R806, Kentucky residential code (815 KAR 7:125) and GAF Timberline installation instructions.

In a Cincinnati winter, a warm attic and a cold overhang are how ice dams start.

Two cutaways of a roof eave in winter. Left: heat leaking into the attic melts snow higher up, the water refreezes on the cold overhang into an ice dam, and meltwater backs up under the shingles. Right: an insulated, air-sealed attic floor and soffit-to-ridge airflow keep the deck cold, and ice and water shield runs at least 24 inches past the wall line as a backup. Illustration · not a photo of an actual job

Ice dams start in the attic

  1. Heat leaks into the attic: and warms the roof deck
  2. Snow melts up high: and runs down the roof
  3. It refreezes on the cold eave: into a ridge of ice
  4. Water backs up: under the shingles, toward the wall
  5. An insulated, air-sealed floor: keeps house heat down
  6. Soffit-to-ridge airflow: keeps the deck cold
  7. Ice & water shield: the backup: at least 24 in past the wall line

Ice and water shield doesn’t stop an ice dam. It keeps the water that backs up behind one out of the house.

Details per Ohio residential code ch. 9, Ohio residential code R806 and Kentucky residential code (815 KAR 7:125).

Walls, windows and gutters

Siding is the part you see. What keeps the wall dry is behind it: the housewrap, the tape and the flashing, every piece lapped so water runs out.

Cutaway of an exterior wall: wood studs, plywood or OSB sheathing, housewrap lapped upper over lower with flashing tape around a pipe, a starter strip, and fiber cement lap siding with at least 1 and a quarter inches of overlap, blind-nailed into the studs, with joint flashing behind a butt joint. Illustration · not a photo of an actual job

A siding wall, layer by layer

  1. Studs: siding nails go into the framing
  2. Sheathing: plywood or OSB
  3. Housewrap (WRB): upper sheet laps over the lower, shingle-style
  4. Flashing tape: seals seams and anything through the wall
  5. Starter strip: 1¼ in; sets the angle of the first board
  6. Fiber cement lap siding: at least 1¼ in overlap
  7. Blind nails: near the top of each board, so the next board hides them
  8. Joint flashing: behind every butt joint

Details per James Hardie HardiePlank installation instructions, Ohio residential code R703 and Kentucky residential code (815 KAR 7:125).

Four steps of flashing a window in a housewrapped wall: tape across the sill turned up the sides; the window installed with tape over each side flange; tape across the head flange over the side tapes; and the housewrap flap folded down over the head tape with its corners taped. Illustration · not a photo of an actual job

Window flashing, bottom up

  1. Sill first: tape across the sill, turned up each side
  2. Window in, then sides: side tapes run past the sill tape and above the head
  3. Then the head: head tape laps over both side tapes
  4. Wrap flap down: the housewrap folds over the head tape; corners taped

The common sequence. The window maker’s own instructions always govern.

Cutaway of a seamless K-style gutter on the fascia: hidden hangers that clip the front lip and screw through the back into the fascia, a drip edge and shingles hanging over into the gutter, a mesh gutter guard over part of the run, and a diagram of the gutter sloping toward the downspout. Illustration · not a photo of an actual job

Gutters: hung right, pitched right

  1. Hidden hangers: clip the front lip and screw through the back into the fascia; Gentek’s maximum is 32 in apart
  2. Screwed into the fascia: solid wood behind it
  3. Drip edge over the gutter: so roof water drops in, not behind it
  4. Gutter guard: keeps leaves out; lifts off for cleaning
  5. Downspout outlet: at the low end of the run: at least ¼ in of drop per 10 ft
  6. Seamless K-style: one piece corner to corner, 5 in or 6 in aluminum

Details per Gentek rainware installation guide.

After a storm

When I inspect after hail or wind, this is the list I work through, top to bottom, with photos of everything I find.

A house with eight numbered spots: shingles on every slope, ridge cap and roof vents, flashing and pipe boots, gutters and downspouts, soft metals such as vents and air-conditioner fins, siding and window trim, fascia and soffit, and the attic. Illustration · not a photo of an actual job

What I check after a storm

  1. Shingles, every slope: hail hits, creases, missing pieces
  2. Ridge cap & roof vents: cracks, lifted caps, dented vents
  3. Flashing & pipe boots: chimney, walls, valleys, boots
  4. Gutters & downspouts: dents, sags, pulled hangers
  5. Soft metals: vents and AC fins show how big the hail was
  6. Siding & window trim: dents, cracks, holes
  7. Fascia & soffit: rot, gaps, loose trim
  8. The attic, if you’re home: stains, daylight, ventilation

Every finding gets photographed. The inspection is free; a written photo report is $150 if you want one.

Sources

Every number in these drawings comes from the manufacturer’s installation instructions or the residential code as Ohio and Kentucky adopted it. Where a drawing shows a common method instead, it says so. If anything here ever disagrees with the manufacturer, the manufacturer is right.